RFQ 2026-13 | RFQ

Trail Bridge Structural Engineering

Structural assessment and repair design for the Miller Creek footbridge on Cedar Ridge Trail.

OpenCapital ProjectsEstimated value $45,000 to $70,000

21 days left to respond

Submissions close at 2:00 p.m. on October 9, 2026. The district’s email server timestamp governs and late submissions are not accepted.

Key dates

Issued
September 14, 2026
Questions due
September 30, 2026 at 2:00 p.m.
Submissions due
October 9, 2026 at 2:00 p.m.

Scope of work

  • Structural condition assessment of the existing timber footbridge at mile 1.8
  • Load rating and determination of remaining service life
  • Repair design and construction documents
  • Evaluation of replacement alternatives with planning-level costs
  • Construction administration during the repair

How to submit

  1. 01Submit one electronic copy in PDF to purchasing@evergreencsd.gov by 2:00 p.m. on the due date.
  2. 02Statements of qualifications are limited to 15 pages.
  3. 03A site visit is available by appointment. Contact the Capital Projects Manager to arrange access.
  4. 04Award is anticipated at the December 8, 2026 board meeting.

Questions and answers

Questions received in writing, with the district’s answers. Answers are issued to every proposer and form part of the solicitation.

Is the bridge currently open to the public?
No. The bridge has been closed since October 5, 2026 and a signed detour is in place. Access for site visits is arranged through the Capital Projects Manager.Answered September 16, 2026

Solicitation documents